Metropolitan St. Louis Sewer District

Approved Materials List

Approved List of Materials and Suppliers for Sewer Construction

Approved List as of: October, 2012

The approved list of materials and suppliers for sewer construction has been compiled by the Construction Division of the Engineering Department. Additions and deletions are made continuously. In between updates of the online list, contractors pre-qualified with MSD will be notified in writing when a material or a supplier has been removed from the list. When a new material or supplier has been approved, a copy of the approval letter from MSD to the manufacturer or supplier may be used as evidence of acceptability.

The date at the top of the title page indicates when the online version of the approved list was last updated. The date that each category was last dated is indicated below.

If you have questions about this approved list, please contact (314) 768-6388.

Brick May 2008
Castings March 2011
Crushed Limestone & Screenings January 2011
Manhole Adjustment January 2012
Pipe Shear Band Coupling January 2012
Piping, Clay June 2006
Piping, Composite June 2000
Piping, Concrete May 2013
Piping, Polypropylene October 2012
Piping, HDPE September 2012
Piping, PVC March 2011
Precast Concrete Stormwater Structures September 2012
Precast Manholes September 2012
Service Connection Taps February 2012

 

Instructions for Requesting Product Addition to Approved Materials List